2011

Geotechnical Results

Aeolian Dynamics has today received the results of the geotechnical investigation for the foundation works at the Agia Anna wind farm site, following sampling from 12 boreholes. The results shows that the land is suitable for the foundation loads of the planned turbines.

CERA License Amendment

Aeolian Dynamics announces the amendment to a project license with CERA, the Cyprus Energy Regulating Authority, for the construction of a 10.8MW wind farm on a site at Agia Anna in Cyprus.

CRES Wind Resource Assessment

Aeolian Dynamics announces today that, following a 24 month wind measurement campaign, it has now received the Wind Resource Assessment and Production Study from the Centre for Renewable Energy Sources and Saving (CRES). The result of the study shows that the Agia Anna 10.8MW wind farm should produce in excess of 22 GWhs of mean annual net energy production.