First Met Mast Installed
09/10/08 14:00
Aeolian Dynamics announces the installation of the first 42m met mast at Psevdas, near the proposed Agia Anna wind farm site in the district of Larnaca. It is intended that this will be the first of several met masts which will allow for a comprehensive wind study and the optimal micro-siting of one or two wind farms. Aeolian Dynamics has selected Enertec SA to perform the measurements as they are accredited by the Hellenic Accreditation System SA.